Page 99000817 "Prod. Order Routing"

Base Application · Microsoft.Manufacturing.Document

Across versions

  1. BC23-30present

Neighbourhood 9 connected objects and pages

Table 5409 "Prod. Order Routing Line" (relates to)Prod. Order Routing LineTable 5409 "Prod. Order Routing Line" (pages and codeunits on it, 2 links)Prod. Order Routing LinePage extension 20400 "Qlty. Prod. Order Routing" (extended by)Qlty. Prod. Order RoutingPage extension 20503 "Subc. Prod. Order Rtng." (extended by)Subc. Prod. Order Rtng.Page extension 6248 "Sust. Prod. Order Routing" (extended by)Sust. Prod. Order RoutingCodeunit 99000755 "Shop Calendar Management" (calls)Shop Calendar ManagementTable 5406 "Prod. Order Line" (calls)Prod. Order LineCreate routings (Learn pages)Create routingsSustainability value chain in production (Learn pages)Sustainability value chain i…

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Base Application · Microsoft.Manufacturing.Document · BC23-30 · source at ea08af5e · facts from BC29

Properties

Property Value
Caption Prod. Order Routing
SourceTable Prod. Order Routing Line
PageType List

Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).

Group Control Shows ToolTip
Control1 Prod. Order No. Prod. Order No. Specifies the number of the related production order. from the table field
Schedule Manually Schedule Manually Specifies that the underlying capacity need is recalculated each time a change is made in the schedule of the routing. from the table field
Operation No. Operation No. Specifies the operation number. from the table field
Previous Operation No. Previous Operation No. Specifies the previous operation number. from the table field
Next Operation No. Next Operation No. Specifies the next operation number. from the table field
Type Type Specifies the type of operation. from the table field
No. No. Specifies the number of the involved entry or record, according to the specified number series. from the table field
Description Description Specifies the description of the operation. from the table field
Description 2 Description 2 Specifies additional description text. from the table field
Flushing Method Flushing Method Specifies the method to use to calculate and handle output at the work or machine center. Manual: Output must be posted manually by using the output journal. Forward: Output is automatically calculated and posted when you change the status of a simulated, planned (or firm planned) production order t… from the table field
Starting Date-Time Starting Date-Time Specifies the starting date and the starting time, which are combined in a format called “starting date-time”. from the table field
Starting Time StartingTime Specifies the starting time of the routing line (operation).
Starting Date StartingDate Specifies the starting date of the routing line (operation).
Ending Date-Time Ending Date-Time Specifies the ending date and the ending time, which are combined in a format called “ending date-time”. from the table field
Ending Time EndingTime Specifies the ending time of the routing line (operation).
Ending Date EndingDate Specifies the ending date of the routing line (operation).
Setup Time Setup Time Specifies the setup time of the operation. from the table field
Setup Time Unit of Meas. Code Setup Time Unit of Meas. Code Specifies the unit of measure code that applies to the setup time of the operation.
Run Time Run Time Specifies the run time of the operation. from the table field
Run Time Unit of Meas. Code Run Time Unit of Meas. Code Specifies the unit of measure code that applies to the run time of the operation.
Wait Time Wait Time Specifies the wait time after processing. from the table field
Wait Time Unit of Meas. Code Wait Time Unit of Meas. Code Specifies the unit of measure code that applies to the wait time. from the table field
Move Time Move Time Specifies the move time. from the table field
Move Time Unit of Meas. Code Move Time Unit of Meas. Code Specifies the unit of measure code that applies to the move time. from the table field
Fixed Scrap Quantity Fixed Scrap Quantity Specifies the fixed scrap quantity. from the table field
Routing Link Code Routing Link Code Specifies a routing link code. from the table field
Scrap Factor % Scrap Factor % Specifies the scrap factor in percent. from the table field
Send-Ahead Quantity Send-Ahead Quantity Specifies the send-ahead quantity of the operation. from the table field
Concurrent Capacities Concurrent Capacities Specifies the concurrent capacity of the operation. from the table field
Unit Cost per Unit Cost per Specifies the unit cost for this operation if it is different than the unit cost on the work center card. from the table field
Lot Size Lot Size Specifies the number of items that are included in the same operation at the same time. The run time on routing lines is reduced proportionally to the lot size. For example, if the lot size is two pieces, the run time will be reduced by half.
Expected Operation Cost Amt. Expected Operation Cost Amt. Specifies the total cost of operations. It is automatically calculated from the capacity need, when a production order is refreshed or replanned. from the table field
Expected Capacity Ovhd. Cost Expected Capacity Ovhd. Cost Specifies the capacity overhead. It is automatically calculated from the capacity need, when a production order is refreshed or replanned. from the table field
Expected Capacity Need Rec."Expected Capacity Need" / ExpCapacityNeed() Specifies the expected capacity need for the production order.
Routing Status Routing Status Specifies the status of the routing line, such as Planned, In Progress, or Finished. from the table field
Location Code Location Code Specifies the location where the machine or work center on the production order routing line operates. from the table field
Open Shop Floor Bin Code Open Shop Floor Bin Code Specifies the corresponding bin at the machine or work center, if the location code matches the setup of that machine or work center. from the table field
To-Production Bin Code To-Production Bin Code Specifies the bin that holds components with a flushing method, that involves a warehouse activity to bring the items to the bin. from the table field
From-Production Bin Code From-Production Bin Code Specifies the corresponding bin at the machine or work center if the location code matches the setup of that machine or work center. from the table field
Posted Output Quantity Posted Output Quantity Specifies the total output quantity that has been posted to the capacity ledger. Value expressed in base unit of measure. from the table field
Posted Scrap Quantity Posted Scrap Quantity Specifies the total scrap quantity that has been posted to the capacity ledger. Value expressed in base unit of measure. from the table field
Posted Run Time Posted Run Time Specifies the total run time that has been posted to the capacity ledger. from the table field
Posted Setup Time Posted Setup Time Specifies the total set up time that has been posted to the capacity ledger. from the table field
Standard Task Code Standard Task Code Specifies the standard task code that applies to the operation. from the table field

Actions

Group Action ToolTip Runs
Line Comments View or add comments for the record. Page 99000840 “Prod. Order Rtng. Cmt. Sh.”
Tools View or edit information about tools that apply to operations that represent the standard task. Page 99000844 “Prod. Order Routing Tools”
Personnel View or edit information about personnel that applies to operations that represent the standard task. Page 99000845 “Prod. Order Routing Personnel”
Quality Measures View or edit information about quality measures that apply to operations that represent the standard task. Page 99000834 “Prod. Order Rtng Qlty Meas.”
Allocated Capacity View the capacity need, which is the sum of the setup time and the run time. The run time is equal to the run time per piece multiplied by the number of pieces in the production order.
Functions Order Tracking Tracks the connection of a supply to its corresponding demand. This can help you find the original demand that created a specific production order or purchase order.

Procedures

  • Initialize(NewCaption: Text)

Plus 1 local procedures.

Triggers

OnAfterGetRecord, OnAfterGetCurrRecord, OnDeleteRecord, OnInit, OnOpenPage

Relations

Pages and codeunits on this table

Extended by

Calls

From the extracted call graph of BC29 (graphify-al on the snapshot checkout): calls whose target is known from a declared type or an Object::"Name" argument. Interface dispatch and calls through events are not counted, so the list is not complete.

Called by

Documented on Microsoft Learn

Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).

Ask your agent

Procedure bodies are not stored here (D10). The call sections above are our own, per object, from the BC29 call graph. For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Prod. Order Routing"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.