Power BI manufacturing app
The Power BI Manufacturing app section describes the app's reports, its semantic model and its KPIs and measures. It answers questions about capacity utilization, work center and machine center load, production order status and cost, WIP, scrap, and variances.
- 21Learn pages
- 2videos
- 20AL objects
Path: Business functionality > Manufacturing > Manufacturing analytics > Power BI manufacturing app · tier official · system manufacturing · narrative reviewed (checked by Opus)
Overview
The Power BI Manufacturing app gives manufacturing managers, supervisors and business leaders analytics on manufacturing activity. Most pages each cover one report, such as utilization, load, production orders, WIP, scrap or variances. Together they help spot overloaded or underused resources, delays and cost overruns.
Start with the Power BI Manufacturing app page for an overview of the included reports. Then use the report pages for the specific question. Capacity reports include Current Utilization, Historical Utilization, Allocated Hours, Work Center Load, Machine Center Load and Expected Capacity Need. Production order reports include Prod. Order List, Production Order Overview, Released Production Orders, Finished Production Order Breakdown, Production Order WIP, Average Production Times and the Routing Gantt. Production Scrap, Capacity Variance and Consumption Variance cover waste and cost differences.
For building or checking measures, use the semantic model page, which describes the star schema of fact and dimension tables. The KPIs and measures page lists the measures for capacity, production order costs, work centers, scrap, machine center load and routing lines.
Key points
- Capacity reports: Current Utilization (gauges, thresholds), Historical Utilization (downtime, busy periods, bottlenecks), Allocated Hours (over- and underutilized work centers) and Expected Capacity Need (by work center).
- Load reports: Work Center Load and Machine Center Load show capacity, allocated time, availability after orders and load, so centers are not overloaded.
- Statistics reports for work centers and machine centers combine Scrap % and Load KPI cards, an efficiency chart and a Statistics Details table.
- Scrap and variance: Production Scrap analyzes scrap rates by work center, machine center and production order. Capacity Variance and Consumption Variance track expected versus actual cost each month.
- Production order reports: Prod. Order List, Production Order Overview, Released Production Orders and Finished Production Order Breakdown cover status, expected versus finished quantities and cost variances. Average Production Times shows average production time per item to find delays.
- Production Order WIP shows the Ending Balance Value trend, an Inventory Valuation table, and KPIs for Beginning Balance, Consumption, Output and Capacity value.
- Prod. Order Routing Gantt shows a Gantt chart with routing line details, task durations, machine versus work center and non-working days.
- The semantic model uses a star schema with fact tables for capacity, production and value entries, and dimensions for items, routing, work centers and machine centers. A separate page lists all KPIs and measures.
Learn pages
- Allocated Hours: The Allocated Hours report provides an overview of the allocated time, in hours, for each work center.
- Average Production Times: The Average Production Times report shows the detailed average production times for each item.
- Capacity Variance: The Capacity Variance report shows the variance between expected and actual capacity costs on a monthly basis.
- Consumption Variance (Power BI report): The Consumption Variance report highlights the variance between expected and actual consumption costs on a monthly basis.
- Current Utilization: The Current Utilization report provides insights into the manufacturing capacity use and helps with capacity planning.
- Expected Capacity Need (Power BI report): The Expected Capacity Need report provides insights into the capacity you expect to require for each work center.
- Finished Production Order Breakdown (Power BI report): The Finished Production Order Breakdown report provides insights into the expected quantity versus the finished quantity of production orders.
- Historical Utilization: The Historical Utilization report provides insights into the historical utilization of manufacturing resources and machinery equipment over time.
- Machine Center Load: The Machine Center Load report shows the load and the allocated capacity of each machine center.
- Machine Center Statistics: The Machine Center Statistics report shows key performance indicators for each machine center.
- Manufacturing KPIs and measures (Power BI): Get an overview of all the KPIs and measures in the semantic model for the Manufacturing Power BI app.
- Power BI Manufacturing app: The Power BI Manufacturing app provides insights into your manufacturing activities.
- Power BI Manufacturing app semantic model: Get an overview of the Power BI Manufacturing app semantic model, including its business fact and dimension tables and visible fields.
- Prod. Order List: Learn about how to benefit from using the Prod. Order List report.
- Prod.Order Routing Gantt: Learn how to benefit from using the Prod. Order Routing Gantt report.
- Production Order Overview: The Production Order Overview report provides a high-level summary of your organization’s production order activities.
- Production Order WIP: Learn how to benefit from using the Production Order WIP report.
- Production Scrap (Power BI report): The Production Scrap report shows the quantity of capacity scrap each month, with a breakdown by code, location, and item category.
- Released Production Orders: The Released Production Orders report shows information about all released production orders, including expected versus finished quantities and the variance.
- Work Center Load: The Work Center Load report shows the load and the allocated capacity of each work center.
- Work Center Statistics: The Work Center Statistics report shows key performance indicators for each work center.
Videos and posts
Linked by a Haiku matcher with a grounding quote from the item’s summary (link/topics.ts); machine-generated.
- What’s New: Manufacturing Analytics (Updated Power BI App) Electronic Documents(2025 release wave 1) (video): “Manufacturing Power BI App Update; Current Utilization Report Deprecation”
- What’s New: Manufacturing Analytics (2025 release wave 2) (video): “PowerBI app for manufacturing; Excel layouts for manufacturing reports”
Business Central pages and reports
The pages, reports and queries this hub’s Learn pages name (ms.search.form, API reference), joined to the code by exact object id (data/index/docs-objects.json); a page shows the table it runs on.
- Page 36951 “PowerBI Reports Setup” · captioned “Power BI Reports Setup” · on Table 36951 “PowerBI Reports Setup”
- Page 37040 “Current Utilization”
- Page 37041 “Historical Utilization”
- Page 37042 “PowerBI Work Center Load” · captioned “Work Center Load (Power BI)”
- Page 37043 “Allocated Hours” · captioned “Allocated Hours (Power BI)”
- Page 37044 “Expected Capacity Need” · captioned “Expected Capacity Need (Power BI)”
- Page 37045 “Finished Prod. Order Breakdown” · captioned “Finished Production Order Breakdown (Power BI)”
- Page 37046 “Consumption Variance” · captioned “Consumption Variance (Power BI)”
- Page 37047 “Capacity Variance” · captioned “Capacity Variance (Power BI)”
- Page 37048 “Average Productions Times” · captioned “Average Productions Times (Power BI)”
- Page 37049 “PowerBI Released Prod. Orders” · captioned “Released Production Orders (Power BI)”
- Page 37055 “Production Scrap” · captioned “Production Scrap (Power BI)”
- Page 37063 “Manufacturing Report” · captioned “Manufacturing Report (Power BI)”
- Page 37094 “PBI Work Center Statistics” · captioned “Work Center Statistics (Power BI)”
- Page 37095 “PBI Machine Center Statistics” · captioned “Machine Center Statistics (Power BI)”
- Page 37096 “PBI Machine Center Load” · captioned “Machine Center Load (Power BI)”
- Page 37097 “Prod. Order - List” · captioned “Production Order - List (Power BI)”
- Page 37098 “Production Order Overview” · captioned “Production Order Overview (Power BI)”
- Page 37099 “Prod. Order Routings Gantt” · captioned “Production Order Routings Gantt (Power BI)”
- Page 37107 “Production Order WIP” · captioned “Production Order WIP (Power BI)”
Source: Microsoft Learn (CC BY 4.0). Descriptions are Learn’s own.
What Learn documents here 8 of 21 Learn pages
- learnAllocated Hours2024-11-01
- learnAverage Production Times2024-11-01
- learnCapacity Variance2024-11-01
- learnConsumption Variance (Power BI report)2024-11-01
- learnCurrent Utilization2024-11-01
- learnExpected Capacity Need (Power BI report)2024-11-01
- learnFinished Production Order Breakdown (Power BI report)2024-11-01
- learnHistorical Utilization2024-11-01
Show 13 more
- learnMachine Center Load2025-05-26
- learnMachine Center Statistics2025-05-26
- learnManufacturing KPIs and measures (Power BI)2024-11-06
- learnPower BI Manufacturing app2026-03-17
- learnPower BI Manufacturing app semantic model2026-07-03
- learnProd. Order List2025-05-26
- learnProd.Order Routing Gantt2025-05-26
- learnProduction Order Overview2024-04-22
- learnProduction Order WIP2025-05-26
- learnProduction Scrap (Power BI report)2025-05-26
- learnReleased Production Orders2024-11-01
- learnWork Center Load2024-11-01
- learnWork Center Statistics2025-05-26