Manufacturing
Manufacturing in Business Central covers planning, running and costing production orders, from creation through posting consumption, output, scrap and capacity to finishing, reversing and cost adjustment. It answers how-to questions on production order handling, journals, corrections, subcontracting and analytics.
Path: Business functionality > Manufacturing · tier official · system manufacturing · narrative reviewed (checked by Opus)
Overview
Manufacturing in Business Central helps you plan, schedule, execute and analyze production. It uses production BOMs, routings, and work and machine centers to coordinate material consumption, operation time, output and costing. The manufacturing overview page is the best starting point.
The own pages follow the life of a production order. You create the order (item, family or sales order as source, with quantities and dates), then record consumption, output, scrap and run time. This can be done in the Production Journal for one order, or in batch journals for consumption and for output and run times. Capacity journals cover work center or machine center time outside production orders. When the order is done, finished production order costs are calculated and adjusted. Reversal pages cover mistakes.
Two subtopics go deeper. Subcontracting covers delegating operations to vendors. Manufacturing analytics covers the Power BI Manufacturing app, built-in reports and capacity load analysis.
Key points
- Production orders are created with a header (source type item, family or sales order), production lines, quantities and due dates. Lines can be copied from existing orders, and orders can be refreshed when requirements change.
- Consumption can be flushed automatically or posted manually. Batch post consumption can also calculate component usage.
- The Production Journal registers consumption, output, scrap and operation time for a released order in one place.
- Batch post output and run times records quantities, setup and run time, with scrap and stop codes.
- Scrap can be posted manually in the output journal with scrap quantity and reason codes.
- Capacity journals record work or machine center time outside production orders, such as maintenance.
- A production order must have finished status before its costs can be adjusted.
- Transactions can be reversed: consumption, output and subcontracting receipts can be undone, finished orders reopened, or finished without output with WIP write-off.
Subtopics
- Manufacturing analytics (50 pages)
- Subcontracting (5 pages)
More Learn pages
- About finished production order costs: Learn how finished production orders reconcile material, capacity, subcontracting, overhead, work-in-process, inventory, and variances.
- About production orders: Learn about production orders, and how to use them to manage the conversion of purchased materials into manufactured items.
- Batch post consumption: Learn how to manually record component usage for one or more production order lines and reduce the related inventory quantities.
- Batch post production output and run times: Learn how to post completed quantities, scrap, setup time, and run time for one or more released production orders.
- Create production orders: Learn how to manually create a firm planned production order that brings together items, quantities, dates, components, operations, and capacity.
- Manufacturing overview: Explore manufacturing capabilities for planning, capacity, production, costing, quality management, subcontracting, and analytics.
- Post capacities: Learn how to record time used by work and machine centers for maintenance or other activities outside production orders.
- Post scrap manually: Learn how to record scrap quantities and reason codes by production operation without increasing finished output.
- Register consumption output for a production order: Learn how to record component consumption, finished quantities, scrap, and operation time together for a released production order.
- Reverse and correct production order transactions: Learn how to reverse consumption, output, or capacity transactions on production orders, finish orders without output, and reopen finished orders.
Videos, posts and code changes
Linked by a Haiku matcher with a grounding quote from the item’s summary (link/topics.ts); machine-generated.
- #10131 [Extensibility Request] issue 30298: allow production scheduling direction control (code change): “Production order line quantity changes can now be extended to control scheduling direction”
- #10173 [Extensibility Request] issue 30129: expose manufacturing cost calculation events (code change): “Manufacturing extensions can now separate setup and runtime costs during standard cost calculation”
- #10369 Bug 640428: Fix Production BOM Comment Line TableRelation filters (code change): “Table relations in the Production BOM Comment Line table are corrected”
- #10423 Bug 620761: Move subconracting tests from base app to subcontracting app (code change): “production-order requisition line descriptions are restored after vendor validation”
- #10546 [Main] Reopening and re-finishing production order reposts backward-flushed routing capacityupdate (code change): “Reopening and re-finishing a production order no longer reposts backward-flushed”
- #10879 [Main]Reopening and re-finishing production order reposts backward-flushed routing capacityInitial commit (code change): “Production order reopening and re-finishing now correctly handles backward-flushed routing capacity”
- #12059 [Master]-Reverse Production Entry fails when production output is posted using a non-base Unit of Measure. (code change): “Reversing a production entry no longer fails when the production output”
- #12068 Bug 651757: [Repair Item] [Manufacturing] Warehouse Pick is not generated for Make-to-Order subassembly after registered put-away (code change): “Warehouse Pick is not generated for Make-to-Order subassembly after registered put-away”
- #9075 Bug 598820: Item Availability by Event from Prod. Order ignores demand after Due Date (code change): “Item Availability by Event from Prod. Order ignores demand after Due Date”
- #9087 Bug 641331: Copy Production Order Document lookup shows the current document (code change): “Copy Production Order Document report now excludes the current production order from the document lookup”
- #9660 [Master]-Act Consumption Qty field in Component of a Firm Planned Order has amounts that point to a Released Production Order that has the same Document No if the component is the same (code change): “Act. Consumption Qty shown for components of a firm planned production order”
- #9670 [Main] - Posting from Released production order affects Firm planned production order with same ID. (code change): “Posting from Released production order affects Firm planned production order”
- #9803 [master] Variant Code mandatory should not allow to refresh the production order with no variant code (code change): “Variant Code mandatory should not allow to refresh the production order”
- #9967 [Main]-Production BOM Version certification does not check Variant Mandatory on lines (code change): “Production BOM Version certification now validates that variant codes are populated”
- Reopen Finished Production Orders (community post): “Reopen Finished Production Orders. Business Central now allows users to reopen finished production orders”
- What’s New in Manufacturing: Costing (2025 release wave 1) (video): “Production bill of material and routing on stock keeping unit; Standard cost per stock keeping unit”
- Manufacturing Foundations BOM (2026) (video): “bill of materials; production order; assembly; replenishment; components; bom versions”
- What’s New in Manufacturing: Streamline Product Design (2025 release wave 1) (video): “production bom; document attachments; bom versions; version comparison”
- Execution & Control Flushing Methods (2026) (video): “flushing methods; production orders; material consumption”
- Manufacturing Fundamentals Routing (2026) (video): “routing; production order; serial operations; parallel operations; operational times”
- What’s new in SCM: Subcontracting (2026 release wave 2) (video): “production orders; routing; work in progress items”
- What’s New in Manufacturing: Order Processing (2025 release wave 1) (video): “production order; usability; bulk status change; attachments; scheduling; safety lead time”
- What’s New in Manufacturing: Reverse Production Order Transactions (2025 release wave 1) (video): “reverse production order transactions; production order reopening”
- What’s New in Manufacturing: Integration to Warehouse (2025 release wave 1) (video): “warehouse putaway; production output; directed putaway and pick”
- Manufacturing Foundations Production Orders (2026) (video): “production orders; bill of materials; routing; capacity planning”
Business Central pages and reports
The pages, reports and queries this hub’s Learn pages name (ms.search.form, API reference), joined to the code by exact object id (data/index/docs-objects.json); a page shows the table it runs on.
- Page 5406 “Prod. Order Line List” · on Table 5406 “Prod. Order Line”
- Page 5407 “Prod. Order Comp. Line List” · captioned “Prod. Order Comp. Lines” · on Table 5407 “Prod. Order Component”
- Page 5510 “Production Journal” · on Table 83 “Item Journal Line”
- Page 5728 “Manufacturers” · on Table 5720 “Manufacturer”
- Page 5832 “Capacity Ledger Entries” · on Table 5832 “Capacity Ledger Entry”
- Page 8903 “Manufacturing Manager RC”
- Page 9011 “Shop Supervisor Mfg Foundation” · captioned “Shop Supervisor - Manufacturing Foundation”
- Page 9012 “Shop Supervisor Role Center” · captioned “Shop Supervisor - Manufacturing Comprehensive”
- Page 9013 “Machine Operator Role Center” · captioned “Machine Operator - Manufacturing Comprehensive”
- Page 9041 “Shop Supervisor Activities” · captioned “Activities” · on Table 9056 “Manufacturing Cue”
- Page 9044 “Shop Super. basic Activities” · captioned “Activities” · on Table 9056 “Manufacturing Cue”
- Page 9047 “Machine Operator Activities” · captioned “Activities” · on Table 9056 “Manufacturing Cue”
- Page 9323 “Simulated Production Orders” · on Table 5405 “Production Order”
- Page 9324 “Planned Production Orders” · on Table 5405 “Production Order”
- Page 9325 “Firm Planned Prod. Orders” · on Table 5405 “Production Order”
- Page 9326 “Released Production Orders” · on Table 5405 “Production Order”
- Page 9327 “Finished Production Orders” · on Table 5405 “Production Order”
- Page 37040 “Current Utilization”
- Page 37041 “Historical Utilization”
- Page 37042 “PowerBI Work Center Load” · captioned “Work Center Load (Power BI)”
- Page 37043 “Allocated Hours” · captioned “Allocated Hours (Power BI)”
- Page 37044 “Expected Capacity Need” · captioned “Expected Capacity Need (Power BI)”
- Page 37045 “Finished Prod. Order Breakdown” · captioned “Finished Production Order Breakdown (Power BI)”
- Page 37046 “Consumption Variance” · captioned “Consumption Variance (Power BI)”
- Page 37047 “Capacity Variance” · captioned “Capacity Variance (Power BI)”
- Page 37048 “Average Productions Times” · captioned “Average Productions Times (Power BI)”
- Page 37049 “PowerBI Released Prod. Orders” · captioned “Released Production Orders (Power BI)”
- Page 37055 “Production Scrap” · captioned “Production Scrap (Power BI)”
- Page 99000768 “Manufacturing Setup” · on Table 99000765 “Manufacturing Setup”
- Page 99000773 “Capacity Journal” · captioned “Capacity Journals” · on Table 83 “Item Journal Line”
- Page 99000778 “Recurring Capacity Journal” · captioned “Recurring Capacity Journals” · on Table 83 “Item Journal Line”
- Page 99000779 “Stop Codes” · on Table 99000761 “Stop”
- Page 99000780 “Scrap Codes” · on Table 99000762 “Scrap”
- Page 99000784 “Manufacturing Comment Sheet” · captioned “Comment Sheet” · on Table 99000770 “Manufacturing Comment Line”
- Page 99000785 “Manufacturing Comment List” · captioned “Comment List” · on Table 99000770 “Manufacturing Comment Line”
- Page 99000802 “Capacity Units of Measure” · on Table 99000780 “Capacity Unit of Measure”
- Page 99000813 “Planned Production Order” · on Table 5405 “Production Order”
- Page 99000814 “Planned Prod. Order Lines” · captioned “Lines” · on Table 5406 “Prod. Order Line”
- Page 99000815 “Production Order List” · on Table 5405 “Production Order”
- Page 99000816 “Production Order Statistics” · on Table 5405 “Production Order”
- Page 99000820 “Prod. Order Capacity Need” · on Table 5410 “Prod. Order Capacity Need”
- Page 99000823 “Output Journal” · captioned “Output Journals” · on Table 83 “Item Journal Line”
- Page 99000827 “Recurring Output Journal” · captioned “Recurring Output Journals” · on Table 83 “Item Journal Line”
- Page 99000829 “Firm Planned Prod. Order” · on Table 5405 “Production Order”
- Page 99000830 “Firm Planned Prod. Order Lines” · captioned “Lines” · on Table 5406 “Prod. Order Line”
- Page 99000831 “Released Production Order” · on Table 5405 “Production Order”
- Page 99000832 “Released Prod. Order Lines” · captioned “Lines” · on Table 5406 “Prod. Order Line”
- Page 99000833 “Check Prod. Order Status” · on Table 27 “Item”
- Page 99000838 “Prod. Order Comment Sheet” · captioned “Comment Sheet” · on Table 5414 “Prod. Order Comment Line”
- Page 99000839 “Prod. Order Comment List” · captioned “Comment List” · on Table 5414 “Prod. Order Comment Line”
- Page 99000846 “Consumption Journal” · captioned “Consumption Journals” · on Table 83 “Item Journal Line”
- Page 99000850 “Recurring Consumption Journal” · captioned “Recurring Consumption Journals” · on Table 83 “Item Journal Line”
- Page 99000866 “Capacity Constrained Resources” · on Table 99000866 “Capacity Constrained Resource”
- Page 99000867 “Finished Production Order” · on Table 5405 “Production Order”
- Page 99000868 “Finished Prod. Order Lines” · captioned “Lines” · on Table 5406 “Prod. Order Line”
- Page 99000882 “Change Status on Prod. Order”
- Page 99000897 “Available - Prod. Order Lines” · on Table 5406 “Prod. Order Line”
- Page 99000898 “Available - Prod. Order Comp.” · on Table 5407 “Prod. Order Component”
- Page 99000900 “Avail. - Planning Components” · on Table 99000829 “Planning Component”
- Page 99000912 “Simulated Production Order” · on Table 5405 “Production Order”
- Page 99000913 “Simulated Prod. Order Lines” · captioned “Lines” · on Table 5406 “Prod. Order Line”
- Page 99000914 “Change Production Order Status” · on Table 5405 “Production Order”
- Page 99000917 “Report Selection - Prod. Order” · captioned “Report Selection - Production” · on Table 77 “Report Selections”
- Page 50 “Purchase Order” · on Table 38 “Purchase Header” · via Subcontracting
- Page 5805 “Item Charge Assignment (Purch)” · on Table 5805 “Item Charge Assignment (Purch)” · via Subcontracting
- Page 36951 “PowerBI Reports Setup” · captioned “Power BI Reports Setup” · on Table 36951 “PowerBI Reports Setup” · via Manufacturing analytics
- Page 37063 “Manufacturing Report” · captioned “Manufacturing Report (Power BI)” · via Manufacturing analytics
- Page 37094 “PBI Work Center Statistics” · captioned “Work Center Statistics (Power BI)” · via Manufacturing analytics
- Page 37095 “PBI Machine Center Statistics” · captioned “Machine Center Statistics (Power BI)” · via Manufacturing analytics
- Page 37096 “PBI Machine Center Load” · captioned “Machine Center Load (Power BI)” · via Manufacturing analytics
- Page 37097 “Prod. Order - List” · captioned “Production Order - List (Power BI)” · via Manufacturing analytics
- Page 37098 “Production Order Overview” · captioned “Production Order Overview (Power BI)” · via Manufacturing analytics
- Page 37099 “Prod. Order Routings Gantt” · captioned “Production Order Routings Gantt (Power BI)” · via Manufacturing analytics
- Page 37107 “Production Order WIP” · captioned “Production Order WIP (Power BI)” · via Manufacturing analytics
- Page 99000788 “Production BOM Lines” · captioned “Lines” · on Table 99000772 “Production BOM Line” · via Subcontracting
- Page 99000818 “Prod. Order Components” · on Table 5407 “Prod. Order Component” · via Subcontracting
- Page 99000886 “Subcontracting Worksheet” · captioned “Subcontracting Worksheets (Obsolete)” · on Table 246 “Requisition Line” · via Subcontracting
- Page 99000887 “Work Center Load” · on Table 99000754 “Work Center” · via Manufacturing analytics
- Page 99000888 “Work Center Load Lines” · captioned “Lines” · on Table 933 “Load Buffer” · via Manufacturing analytics
- Page 99000889 “Machine Center Load” · on Table 99000758 “Machine Center” · via Manufacturing analytics
- Page 99000890 “Machine Center Load Lines” · captioned “Lines” · on Table 933 “Load Buffer” · via Manufacturing analytics
- Page 99000891 “Work Center Group Load” · on Table 99000756 “Work Center Group” · via Manufacturing analytics
- Page 99000892 “Work Center Group Load Lines” · captioned “Lines” · on Table 933 “Load Buffer” · via Manufacturing analytics
- Page 99000915 “Work Center Task List” · on Table 5409 “Prod. Order Routing Line” · via Manufacturing analytics
- Page 99000916 “Machine Center Task List” · on Table 5409 “Prod. Order Routing Line” · via Manufacturing analytics
- Report 5802 “Inventory Valuation - WIP” · captioned “Production Order - WIP” · via Manufacturing analytics
- Report 5871 “Item - Able to Make (Timeline)” · via Manufacturing analytics
- Report 5872 “BOM Cost Share Distribution” · via Manufacturing analytics
- Report 99000753 “Quantity Explosion of BOM” · via Manufacturing analytics
- Report 99000754 “Rolled-up Cost Shares” · via Manufacturing analytics
- Report 99000755 “Single-level Cost Shares” · via Manufacturing analytics
- Report 99000756 “Detailed Calculation” · via Manufacturing analytics
- Report 99000757 “Where-Used (Top Level)” · via Manufacturing analytics
- Report 99000758 “Compare List” · captioned “Item BOM Compare List (Obsolete)” · via Manufacturing analytics
- Report 99000759 “Work Center List” · via Manufacturing analytics
- Report 99000760 “Machine Center List” · via Manufacturing analytics
- Report 99000762 “Prod. Order - Job Card” · via Manufacturing analytics
- Report 99000763 “Prod. Order - List” · captioned “Production Order - List” · via Manufacturing analytics
- Report 99000764 “Prod. Order - Precalc. Time” · via Manufacturing analytics
- Report 99000767 “Prod. Order - Calculation” · captioned “Prod. Order - Calculation (Obsolete)” · via Manufacturing analytics
- Report 99000768 “Prod. Order - Detailed Calc.” · via Manufacturing analytics
- Report 99000769 “Output Item Label” · captioned “Production Output Item Label” · via Manufacturing analytics
- Report 99000780 “Capacity Task List” · via Manufacturing analytics
- Report 99000783 “Work Center Load” · captioned “Work Center Load (obsolete)” · via Manufacturing analytics
- Report 99000784 “Machine Center Load” · captioned “Machine Center Load (obsolete)” · via Manufacturing analytics
- Report 99000786 “Machine Center Load/Bar” · captioned “Machine Center Load/Bar (obsolete)” · via Manufacturing analytics
- Report 99000787 “Routing Sheet” · via Manufacturing analytics
- Report 99000788 “Prod. Order - Shortage List” · via Manufacturing analytics
- Report 99000789 “Subcontractor - Dispatch List” · via Manufacturing analytics
- Report 99000791 “Production Order Statistics” · via Manufacturing analytics
Learn also names 6 objects with no object page: page/9900083, page/99001503, page/99001504, page/99001560, page/99001561, report/990000785.
Source: Microsoft Learn (CC BY 4.0). Descriptions are Learn’s own.
What Learn documents here 8 of 65 Learn pages
- learnAbout finished production order costs2026-07-15
- learnAbout production orders2026-06-02
- learnAllocated Hours2024-11-01
- learnAssign item charges to subcontracting receipts2026-06-02
- learnAverage Production Times2024-11-01
- learnBatch post consumption2026-07-15
- learnBatch post production output and run times2026-07-15
- learnBOM Cost Share Distribution (report)2024-10-23
Show 32 more
- learnCapacity Task list (report)2024-10-23
- learnCapacity Variance2024-11-01
- learnConsumption Variance (Power BI report)2024-11-01
- learnCreate production orders2026-09-04
- learnCurrent Utilization2024-11-01
- learnDetailed Calculation (report)2024-10-23
- learnExpected Capacity Need (Power BI report)2024-11-01
- learnFinished Production Order Breakdown (Power BI report)2024-11-01
- learnHistorical Utilization2024-11-01
- learnItem - Able to Make (Time) (report)2024-10-23
- learnItem BOM Compare list (report)2024-11-04
- learnMachine Center List (report)2024-11-01
- learnMachine Center Load2025-05-26
- learnMachine Center Load (report)2024-11-01
- learnMachine Center Load/Bar (report)2024-11-01
- learnMachine Center Statistics2025-05-26
- learnManage components in subcontracting2026-07-08
- learnManufacturing analytics2025-05-26
- learnManufacturing KPIs and measures (Power BI)2024-11-06
- learnManufacturing overview2026-07-15
- learnOrder subcontracting2026-09-04
- learnOutput Item Label report2026-09-18
- learnPost capacities2026-07-15
- learnPost scrap manually2026-07-15
- learnPower BI Manufacturing app2026-03-17
- learnPower BI Manufacturing app semantic model2026-07-03
- learnProd. Order - Calculation (report)2024-10-23
- learnProd. Order - Job Card (report)2024-10-23
- learnProd. Order - Precalc. Time (report)2024-11-01
- learnProd. Order - Shortage List (report)2026-09-10
- learnProd. Order Detailed Calc (report)2024-11-01
- learnProd. Order List2025-05-26