Subcontracting FastTab in Manufacturing setup
Subcontracting FastTab in Manufacturing setup
Manufacturing setup gets a Subcontracting FastTab with a Create production order info line toggle. It also holds a component transfer lead time.
Area: Supply chain. Status: GA. Developer relevance: medium. Airtime: 1 min across 1 video, demoed.
Status evidence
- Nothing said about status; launch event convention: generally available unless stated otherwise.
Where they talk about it
- What's new in SCM: Subcontracting: 10:05 to 10:48, demo at 10:05 (called "Manufacturing setup: subcontracting FastTab" there)
Quotes
- no validated quote falls inside this feature's time range
Caveats mentioned
- The lead time field is only introduced, its use comes later
Documented features match
- Set up and explore subcontracting more easily - medium confidence (override). Docs say: General availability, roadmap id 573353. Re-check of 2026-10-02 against the full what's new text (the matching step only saw the first 220 characters): "Review company defaults such as the worksheet template and batch, production-order information lines, component costs, and transfer lead time."
- Product documentation: Set up subcontracting, checked 2026-10-02. On the Subcontracting FastTab, in the General section: Create Prod. Order Info Line, Subcontracting Component Transfer Lead Time, journal template and batch, Component Direct Unit Cost. Note: Subcontracting app shipped in 2026 release wave 1 (GA 2026-07-08); article documents the app, not specifically wave 2.
Docs checked on 2026-10-02: the match is against Microsoft's what's new pages for the wave as they were on that date. Microsoft keeps filling the documentation, so "no documented item" can go stale.
Tags: subcontracting, setup, manufacturing, admin
Generated by pipeline step 06. Source: YouTube auto-captions of the launch event videos, see the deep links. Not official.