Dynamic previous and next operations in routings
Dynamic previous and next operations in routings
Previous and next operation fields are visible for parallel routings and hidden for serial ones.
Area: Supply chain. Status: GA. Developer relevance: low. Airtime: 1 min across 1 video, demoed.
Status evidence
- Nothing said about status; launch event convention: generally available unless stated otherwise.
Where they talk about it
- What's new in SCM: Overview: 6:58 to 7:36, demo at 6:58 (called "Dynamic visibility of previous and next operations in routings" there)
Quotes
- no validated quote falls inside this feature's time range
Prerequisites mentioned
- Routing type set to parallel
Documented features match
- Work more efficiently with manufacturing documents and capacity calendars - low confidence (override). Docs say: General availability, roadmap id 573358. Re-check of 2026-10-02: the full what's new text (2,483 characters) never mentions previous or next operation fields; the item is the nearest manufacturing item, not a description of this feature.
- Product documentation (partial, the article describes the broader feature or mentions this in passing): Create routings, checked 2026-10-02. In a parallel routing, the Next Operation No. field on each routing line tells Business Central which operation to schedule after the current one completes. Note: Documents Next Operation No. for parallel routings but not the dynamic show/hide of previous and next operation fields for serial vs parallel.
Docs checked on 2026-10-02: the match is against Microsoft's what's new pages for the wave as they were on that date. Microsoft keeps filling the documentation, so "no documented item" can go stale.
Tags: manufacturing, routing, ux
Generated by pipeline step 06. Source: YouTube auto-captions of the launch event videos, see the deep links. Not official.